Skip to main content
Baskara Riau Teknik
BASKARA RIAU TEKNIK 20 kV MV & LV CONTRACTOR
Heavy crane truck erecting 20 kV concrete medium voltage pole along oil palm plantation access road in Sumatra, guided by certified electrical field crew (Mode Gelap) Instalasi Gardu Trafo 20 kV Baskara Riau Teknik (Mode Terang)
ELECTRICAL CONTRACTOR · SINCE 2008

POWERING INDUSTRY ACROSS INDONESIA

“We provide our customers with the highest-quality, expertly engineered services.”

PROVEN TRACK RECORD & INDUSTRIAL TRUST

TRUSTED BY MULTINATIONAL CORPORATIONS & PALM OIL MILL OPERATORS

Long-term engineering partnerships with leading agribusiness conglomerates and heavy industrial plants across Sumatra and Kalimantan.

KLK Group (Kuala Lumpur Kepong Berhad)
PT Adei Plantation & Industry (Riau)
PT Steelindo Wahana Perkasa (Bangka Belitung)
PT Paripurna Swakarsa (Kalimantan)
Private Palm Oil Mills (PKS) across Riau & North Sumatra
Hospital & Commercial Hotel Networks in Pekanbaru & Dumai
OPERATIONAL ETHOS

CORE VALUES OF BRT

RELIABLE

Reliable (Andal)

Precision engineering adhering to Indonesian PUIL 2011, SPLN, and international IEC safety codes. We design systems with generous load margins, multi-tier protection, and uninterrupted operational resilience.

HONEST

Honest (Jujur)

Uncompromising transparency: 100% genuine components with OEM certificates (Schneider, ABB, Legrand, Supreme Cables). No material downgrades, verified torque audits, and verifiable megger test reports.

ON TIME

On Time (Tepat Waktu)

Strict schedule discipline to safeguard your scheduled plant turnaround and factory shutdowns. Based in Pekanbaru with rapid-response crew mobilization to remote plantation estates across Sumatra in hours.

ENGINEERING SPECIALIZATION

8 SPECIALIZED MEDIUM & LOW VOLTAGE SERVICES

From precision panel fabrication at our Pekanbaru workshop to full-scale 20 kV substation installation and ministry certification in the field.

Instalasi Cubicle 20 kV Schneider Electric SM6 di Gardu Distribusi oleh Teknisi Baskara Riau Teknik
Workshop Pekanbaru · Standard PUIL 2011 & IEC
WORKSHOP FABRIKASI MANDIRI

STANDAR PERAKITAN TINGGI DENGAN KOMPONEN TERNAMA DUNIA

Seluruh panel dirakit di fasilitas workshop kami di Pekanbaru menggunakan komponen resmi bersertifikat Schneider Electric, ABB, Legrand, dan kabel Supreme/Kabelmetal. Dilengkapi uji torsi busbar, uji resistansi isolasi 5 kV megger, dan simulasi trip proteksi sebelum pengiriman ke site.

Konsultasi Desain Panel
01 TEGANGAN MENENGAH

20 kV Switchgear Cubicle Fabrication

Modular medium-voltage switchboards: Incoming, Outgoing, Metering, LBS (Load Break Switch), and VCB (Vacuum Circuit Breaker) equipped with digital numerical relays.

Minta Spesifikasi
02 TEGANGAN RENDAH

LVMDP & Sub-Distribution Switchboards

Low Voltage Main Distribution Panels up to 4,000A with forced air/natural cooling, main Air Circuit Breakers (ACB), molded-case breakers (MCCB), and SNI-certified copper busbars.

Minta Spesifikasi
03 EFISIENSI ENERGI

Automatic Capacitor Banks (APFC)

Multistage automatic capacitor banks for reactive power (kVAR) compensation, maintaining power factor above 0.95 and eliminating costly PLN utility penalty surcharges.

Minta Spesifikasi
04 KONTROL & OTOMASI

Specialized Automation & Motor Control Panels

Custom fabrication of ATS-AMF generator auto-transfer panels, multi-genset synchronizing systems, and heavy-duty motor starters (Star-Delta, Soft Starters, and Variable Frequency Drives / VFD).

Minta Spesifikasi
05 GARDU DISTRIBUSI

Substation Transformers 630–1,600 kVA

Installation of oil-immersed and cast-resin dry distribution transformers (20 kV / 400V), shielded elbow bushings, surge arresters, and earth pits with resistance under 1 Ohm.

Minta Spesifikasi
06 JARINGAN LISTRIK

20 kV Overhead & Underground Lines (SKUTM/SKTM)

Construction of concrete pole overhead distribution lines (SKUTM), direct-buried armoured XLPE/NA2XSY cables (SKTM), galvanized crossarms, dropout fuses, and LV aerial bundled cables.

Minta Spesifikasi
07 KABEL TEGANGAN TINGGI

20 kV Medium Voltage Jointing & Termination

High-integrity cold-shrink and heat-shrink cable joints and terminations executed by certified jointers, completely partial-discharge free and verified with high-potential insulation testing.

Minta Spesifikasi
08 LEGALITAS & ENERGIZE

PLN Grid Energization, SLO & NIDI Permitting

Complete turnkey service for new high-power connections and capacity upgrades with PT PLN (Persero), official NIDI issuance from ESDM, and Certificate of Operational Worthiness (SLO).

Minta Spesifikasi
FEATURED PROJECT CASE STUDY

INTEGRATED ELECTRIFICATION FOR MODERN PALM OIL MILL (MPOM) KLK GROUP

Riau, Indonesia · Processing Capacity 60–90 Tons FFB/Hour · Client: PT Adei Plantation & Industry (Subsidiary of Kuala Lumpur Kepong / KLK Berhad, Malaysia)

Inspeksi Teknis Gardu Trafo 1.600 kVA oleh Direktur Gatot Baskoro Adi di Pabrik Kelapa Sawit KLK Group Riau
GARDU TRAFO 1.600 kVA · MPOM KLK GROUP

Baskara Riau Teknik was appointed as the primary electrical engineering contractor for the integrated electrification of KLK Group's flagship Modern Palm Oil Mill in Riau. Confronted with a humid tropical plantation environment and continuous 24/7 milling requirements, BRT engineered and delivered a turnkey 20 kV distribution substation, custom medium-voltage switchgear cubicles, a 3,200A LVMDP integrated with factory turbine/generator ATS-AMF, and reactive power compensation systems.

Challenge: Ensure totally stable 20 kV power devoid of voltage dips, seamless synchronization between biomass steam turbines and PLN utility power, and an unyielding commissioning deadline ahead of peak palm harvest.

BRT Solution: Installation of an oil-cooled 1,600 kVA transformer with anti-pollution sealed bushings, modular LVMDP with tin-plated electrolytic copper busbars, dual-sheath SKTM underground cabling, and expedited coordination with certified inspection bodies for first-pass SLO certification.

1,600 kVA
Substation Transformer Capacity
0 Days
Delay (Delivered Ahead of Deadline)
100 %
First-Time Pass for ESDM SLO License
24/7 Uptime
Continuous Operation Without Trip
OPERATIONAL REACH & OFFICIAL ACCREDITATIONS

6 PROVINCES COVERAGE & CERTIFIED ENGINEERING CREDENTIALS

Our proprietary panel workshop in Pekanbaru is paired with agile mobile crews ready to deploy across remote palm oil estates and industrial industrial zones throughout Sumatra and Kalimantan.

OPERASIONAL SITE

Geographical Service Footprint

★
Riau (Home Base - Pekanbaru, Dumai, Siak, Pelalawan, Kampar, Rohul, Rohil, Inhu, Inhil)
📍
North Sumatra (Medan, Kisaran, Rantau Prapat, Labuhanbatu)
📍
West Sumatra (Padang, Pasaman Barat, Dharmasraya)
📍
Jambi (Jambi City, Muaro Jambi, Tanjung Jabung Barat)
📍
Bangka Belitung Islands (Bangka & Belitung)
📍
West & Central Kalimantan (Ketapang & Surrounding Estates)

* Available for full turnkey deployment across Indonesia for major agribusiness and heavy industrial installations.

STANDAR KESELAMATAN & LEGALITAS

Official Accreditations & Compliance

SKK LEVEL 5

SKK Electrical Construction Competency Level 5

Certified Technical Person in Charge (PJT) officially accredited for medium and low-voltage electrical systems by BNSP & the Ministry of Energy and Mineral Resources (ESDM).

OFFICIAL NIDI

Official NIDI from Ministry of ESDM

Registered Electrical Installation Identification Number (NIDI) recorded in the Directorate General of Electricity national database for all executed works.

ESDM SLO

Certificate of Operational Worthiness (SLO)

Formal technical safety compliance certification issued by government-licensed Technical Inspection Agencies (LIT) prior to energization.

LEGAL NIB

Business ID (NIB): 0220208140793

Fully registered Indonesian commercial entity Baskara Riau Teknik under OSS system with authorized KBLI classification for industrial electrical installations.

FIELD ENGINEERING KNOWLEDGE

MEDIUM VOLTAGE & PALM OIL MILL ELECTRICAL INSIGHTS

Practical field guides synthesized from 18+ years of contracting to help plant directors and procurement leads optimize power efficiency and plant safety.

Eliminating PLN Reactive Power (kVARh) Penalties with Automatic Capacitor Banks ENERGY COST REDUCTION

Eliminating PLN Reactive Power (kVARh) Penalties with Automatic Capacitor Banks

Inductive loads from mill press drives, thrashers, and screw presses drag power factor below 0.85, triggering steep utility fines. Learn how staged automatic power factor correction works.

Read Full Engineering Guide
20 kV Cable Jointing Standards: Preventing Partial Discharge in Peat Soil 20 kV ENGINEERING CODES

20 kV Cable Jointing Standards: Preventing Partial Discharge in Peat Soil

Sumatra's high groundwater and acidic peat soil require immaculate cold-shrink terminations. Critical steps in stress-cone placement and concentric neutral shielding to ensure a 20+ year cable life.

Read Full Engineering Guide
Complete Guide to Obtaining NIDI & SLO Certification for Industrial Plants in Riau REGULATION & SAFETY

Complete Guide to Obtaining NIDI & SLO Certification for Industrial Plants in Riau

Document requirements, soil resistance testing, breaker trip verification, and physical audit workflows required before PT PLN will safely energize an industrial 20 kV connection.

Read Full Engineering Guide
CONSULT DIRECTLY WITH OUR SENIOR ENGINEERS

READY TO BUILD OR UPGRADE YOUR 20 kV INDUSTRIAL ELECTRICAL SYSTEM?

Discuss your switchgear specifications, transformer substation sizing, or plantation overhead grid with the senior engineering team at Baskara Riau Teknik. Fast quotation turnaround.