Skip to main content
Baskara Riau Teknik
BASKARA RIAU TEKNIK 20 kV MV & LV CONTRACTOR
PROVEN TRACK RECORD SINCE 2008

23+ STRATEGIC ELECTRICAL PROJECTS DELIVERED ACROSS 6 PROVINCES

Explore our completed medium-voltage 20 kV substations, panel fabrication, overhead power lines, and emergency turnaround projects for leading multinational agribusiness and industrial corporations.

23 Completed Projects
8 Projects for KLK Group
6 Provinces Footprint
100% ESDM SLO Pass Rate
Filter Projects by Category:
Industry:
Province:
Service Type:
HISTORICAL TRACK RECORD

VERIFIED INDUSTRIAL PROJECT LIST ACROSS 6 PROVINCES

Summary of representative medium and low voltage contracting projects executed by BRT since 2008.

No Project & Facility Client Location Engineering Scope Compliance
01 PKS Modern Palm Oil Mill (MPOM)
Pabrik Sawit Kapasitas 60–90 TPH
PT Adei Plantation / KLK Group Pelalawan, Riau Gardu Trafo 1.600 kVA, Cubicle 20 kV, LVMDP 3.200A SLO ESDM Lolos
02 Pabrik Kernel Crushing Plant (KCP)
Fasilitas Ekstraksi Minyak Inti Sawit
Agri Palm Processing Corp Dumai, Riau Gardu 2.000 kVA & Motor Control Center (MCC) SLO ESDM Lolos
03 Jaringan Transmisi SKUTM 20 kV
Elektrifikasi Perkebunan Sawit Terpencil
Perkebunan Sawit Multinasional Rokan Hulu, Riau 18 km JTM Tiang Beton, Jointing & Recloser SLO ESDM Lolos
04 Automatic Capacitor Bank 600 kVAR
Koreksi Faktor Daya (Power Factor Improvement)
Pabrik Kelapa Sawit Sumatera Labuhanbatu, Sumut Panel Kapasitor 12 Step, Detuned Reactor 7% PF > 0.98 Tercapai
05 Gardu Distribusi RS Swasta 1.250 kVA
Fasilitas Medis & Rawat Inap 8 Lantai
Yayasan Pelayanan Medis Pekanbaru, Riau Trafo Cast Resin 1.250 kVA, ATS-AMF Dual Genset SLO ESDM Lolos
06 Turnaround Cepat & Jointing Kabel 20 kV
Perbaikan Darurat Kabel TM Terbakar
Kawasan Industri Terpadu Bangka Belitung Emergency Splicing, Hi-Pot VLF Test, SLO Rekomendasi Pulih < 36 Jam
07 Elektrifikasi PKS Ketapang 1.000 kVA
Ekspansi Pabrik Sawit Baru
Agri Plantation Group Kalimantan Barat Gardu Trafo 1.000 kVA, Cubicle 20 kV, LVMDP SLO ESDM Lolos
08 Gardu Trafo 800 kVA Pasaman Barat
Pabrik Pengolahan Hasil Perkebunan
Industri Agro Pasaman Sumatera Barat Pemasangan Trafo 800 kVA, Portal Cantol, Grounding SLO ESDM Lolos
START YOUR ELECTRICAL PROJECT

HAVE AN UPCOMING ELECTRICAL EXPANSION OR NEW BUILD?

Benefit from 18+ years of contracting experience, rapid site mobilization, and verified compliance with PT PLN.