BASKARA RIAU TEKNIK 20 kV MV & LV CONTRACTOR
COMPREHENSIVE ELECTRICAL EPC SERVICES

ENGINEERED 20 kV MV & LV ELECTRICAL SOLUTIONS

From certified switchgear cubicle fabrication to high-voltage grid interconnection, Baskara Riau Teknik provides end-to-end electrical infrastructure for palm oil mills, manufacturing facilities, hospitals, and infrastructure across 6 provinces.

20 kV Medium Voltage Specialization
18+ Years Experience Since 2008
SKK L5 Certified Lead Engineers

Quick Summary: Baskara Riau Teknik (BRT) is an Indonesian engineering contractor specializing in 20 kV medium-voltage and low-voltage electrical systems headquartered in Pekanbaru, Riau. Established in 2008, BRT executes switchgear cubicle fabrication, LVMDP panel assembly, 630–2,500 kVA transformer installations, SKUTM/SKTM power line construction, and ESDM-accredited NIDI/SLO grid energization across Sumatra and Kalimantan.

CORE CAPABILITIES

6 Specialized Industrial Electrical Services

Engineered to exact SPLN, PUIL 2011, and IEC standards for maximum reliability and operator safety.

20 kV MV Switchgear

20 kV Switchgear Cubicle Fabrication

Custom fabrication of modular Incoming, Outgoing, Metering, and Coupling cubicles equipped with Vacuum Circuit Breakers (VCB) or Load Break Switches (LBS) from Schneider Electric, ABB, or Siemens.

Low Voltage Main

LVMDP, PUTR & Low Voltage Switchboards

Heavy-duty secondary distribution switchboards with motorized ACB/MCCB breakers up to 4,000 A, copper busbar electro-plating, thermal monitoring, and integrated ATS-AMF genset synchronization.

630 – 2,500 kVA

Distribution Transformer Substations

Procurement, foundation construction, rigging, oil dielectric breakdown testing, and turnkey commissioning of step-down transformers (Trafindo, Bambang Djaja, Schneider) for heavy industrial loads.

kVARh Elimination

Automatic Power Factor Capacitor Banks

Microprocessor-controlled automatic capacitor banks (6 to 12 steps) with harmonic detuned reactors. Keeps plant power factor above 0.85 to completely eliminate costly PLN kVARh surcharges.

Grid Distribution

20 kV Overhead (SKUTM) & Cable Lines (SKTM)

Erection of prestressed concrete poles, cross-arms, lightning arresters, and XLPE medium-voltage conductors across plantation estate roads. Includes certified underground cable jointing and terminations.

Legal Energization

PLN Grid Connection, NIDI & SLO Permitting

Full coordination with PT PLN (Persero) and accredited Technical Inspection Agencies (LIT). We manage digital NIDI registration and official Certificate of Operational Worthiness (SLO) for statutory compliance.

PROJECT DELIVERY METHODOLOGY

5-Stage Engineering Execution Process

Our rigorous stage-gate delivery ensures zero plant downtime risks and strict adherence to project turnaround schedules.

01

SLD Analysis & Site Survey

Comprehensive review of load calculations, single line diagram (SLD), and physical substation layout.

02

Workshop Fabrication & FAT

Enclosure CNC shearing, busbar bending, wiring, insulation dielectric test, and client Factory Acceptance Test.

03

Rigging & Site Erection

Safe heavy transport to mill estate, positioning onto concrete plinths, and high-voltage cable terminations.

04

Secondary Injection & SAT

Protective relay calibration, contact resistance (Ductor), contact timing, and Site Acceptance Testing.

05

SLO Witness & Energization

Official inspection with accredited LIT and PLN dispatcher, NIDI recording, and live energized hand-over.

Plan Your Electrical Project With Our Engineers →